Exported to 120+ Countries Worldwide.Learn More +
Other Cranes

BOB-LIFT Product Range

Other Cranes

Other Cranes from the BOB-LIFT product catalog.

Showing 11 of 11 products

Sort by:

About our other cranes

Our other cranes are BOB-LIFT machines built for jobs that a standard truck or marine crane does not cover. This section groups special-purpose truck cranes with two families of their own: spider cranes and timber cranes.

Directly in this section you will find a 2.45 t garbage crane and a 5.15 t tow truck crane. Our spider cranes come in a knuckle boom and a telescopic boom version for work in tight spaces. Our timber cranes include the SL70, SL150-2A, ZT120Z-2A and ZT160Z-2A, plus the ZM65 and ZM75 with arm lengths of 7,600 mm and 7,667 mm. BOB-LIFT is a crane manufacturer based in Xuzhou, China.

Choose by the job. For waste collection or vehicle recovery, look at the garbage crane or the tow truck crane and tell us the truck it will go on. For work inside buildings or on tight sites, look at the spider cranes, and for loading logs and loose material, look at the timber cranes. For general lifting from a truck, see our truck mounted cranes.

Compare the range

Figures from the BOB-LIFT technical sheets. Confirm the configuration for your truck or vessel with our team.

Model SL70 Timber Crane SL70 SL70 Timber Crane ZM65: Arm Length 7600MM -Timber Crane ZM65 ZM65: Arm Length 7600MM -Timber Crane ZM75: Arm Length 7667MM -Timber Crane ZM75 ZM75: Arm Length 7667MM -Timber Crane SL150-2A Timber Crane SL150-2A SL150-2A Timber Crane ZT120Z-2A Timber Crane ZT120Z-2A ZT120Z-2A Timber Crane Knuckle Spider Crane SQ4ZG3T Knuckle Spider Crane ZT160Z-2A Timber Crane ZT160Z-2A ZT160Z-2A Timber Crane Truck Tail Lift Truck Tail Lift 2.45 Ton Garbage Crane F100Z-2E 2.45 Ton Garbage Crane Telescopic Spider Crane BLS3.0T Telescopic Spider Crane 5.15 Ton Tow Truck Crane SQ5SA2F 5.15 Ton Tow Truck Crane
Capacity 0.6 t 0.7 t 0.7 t 1 t 1.3 t 1.6 t 1.8 t 2 t 2.45 t 2.95 t 5.15 t
Max lifting moment 7 t·m 6.5 t·m 6.5 t·m 15 t·m 12 t·m – 16 t·m – 10 t·m – 14.5 t·m
Self weight 1450 kg 1280 kg 1400 kg 2650 kg 2300 kg – 2700 kg – – – –
Boom sections – – – – – – – – – – 2
Recommended Power 18 kW 18 kW 18 kW 32 kW 25 kW – 35 kW – 18 kW – 22 kW
Hydraulic System Flow 45 L/min 45 L/min 45 L/min 60 L/min 50 L/min – 80 L/min – 40 L/min – 35 L/min
Hydraulic System Pressure 22 MPa 19 MPa 19 MPa 25 MPa 27 MPa – 28 MPa – 28 MPa – 28 MPa
Rotation Angle 380° 380° 380° 380° 380° 360° continuous 380° – 360° continuous 360° continuous 400°
Max. height ≈ 9.1 m ≈ 8.5 m ≈ 9.5 m ≈ 10.8 m ≈ 9 m ≈ 7 m ≈ 10 m – ≈ 8 m ≈ 9.8 m ≈ 8.5 m
Max. boom angle 73° 66° 66° 78° 70° 65° 70° – 80° 70° 70°
Outrigger span 2224–3514 mm – – – 2220–5500 mm 3686 × 3423 mm 2220–5500 mm – – – 2260–5120 mm
Max. radius – – – 8 m – 5.6 m – – 7 m 8.46 m 6.2 m
Max Working Radius – – – – – 5.6 m – – – 8.46 m –
Max Lifting Height (from ground) – – – – – 5.7 m – – – 9 m –
Lifting Angle – – – – – 0–65° – – – 0–70° –
Dimensions (L × W × H) – – – – – 1600 × 1400 × 1730 mm – – – 2850 × 850 × 1600 mm –
Vehicle Weight – – – – – 2460 kg – – – 2200 kg –
Installation Space – – – – – – – – 800 mm – 850 mm

From steel
to shipment.

Photographed at our factory in Xuzhou, Jiangsu: the steps a crane goes through before it leaves.

Parts and hydraulics
01 / 10 Parts and hydraulics Boom sections, cylinders, frames and hydraulic parts are staged next to the assembly line.
Parts and welds
02 / 10 Parts and welds Boom sections, cylinders and hydraulic parts are checked in the workshop before and during assembly.
Assembly halls
03 / 10 Assembly halls Knuckle and telescopic booms are assembled in long rows under overhead cranes.
Load and function test
04 / 10 Load and function test The finished crane is mounted on the test bay and runs through lifting, slewing and outrigger functions under load.
Lift the crane onto the chassis
05 / 10 Lift the crane onto the chassis An overhead hoist holds the crane while it is placed on the truck frame in the workshop.
Fix the crane to the frame
06 / 10 Fix the crane to the frame Technicians work under the cab to secure the crane base to the chassis.
Check the finished truck
07 / 10 Check the finished truck The crane stands complete on the truck with its boom raised for inspection.
Line up the order
08 / 10 Line up the order Every crane in an order is tested, set on its base or a pallet and lined up in the hall before packing.
Wrap the crane
09 / 10 Wrap the crane Cranes that ship without a chassis are wrapped in stretch film before they leave the workshop.
Load the container
10 / 10 Load the container A hoist or a forklift moves each packed crane into the container.

Mini loaders and dumpers

Mini skid steer loaders, mini dumpers and attachments, on the BOB-LIFT loader site.

Visit bobliftloader.com

You are leaving this website

· Official BOB-LIFT website

This is one of our own websites, run by BOB-LIFT. It opens in a new tab, so this page stays open for you.